top of page

Search this site

75 results found with an empty search

  • Pisgah Methodist Church

    Hiddenite, NC Pisgah Methodist Church Hiddenite, NC This design-build project includes an 11,012-square-foot fellowship center addition with an industrial kitchen, a stage, a large multipurpose room, and restrooms. Design/Build by G.L. Wilson Building Company. “Our project, which we refer to as ‘The Great Hall’ is a once in a lifetime building for our congregation. Our building has been done in multi-phases due to our funding but G.L. Wilson Building Company stayed with us the whole way. The team at G.L. Wilson helped us use every bit of our space as creatively as possible and if any hiccups came up we knew they would be the first to help us get it fixed. The team that worked on our project daily, Superintendents John Garland initially and then Devan Rogers, along with Jeff Kerley as Project Manager, were great to work with and very responsive to our needs and wishes. We knew we were not the biggest project they had going on at the time, but they made us feel as if we were their only project. We have nothing but high praises for G.L. Wilson Building Company and everyone on their team. We didn’t just build a building; we built personal relationships within this company, and know they will be the first we call if we need any work done. I would recommend them to anyone and I often do just that.” Rev. Mike Duncan / Pisgah Methodist Church

  • Union Grove Lumber

    Union Grove, NC Union Grove Lumber Union Grove, NC To bring their new headquarters to life, Union Grove Lumber hired G.L. Wilson Building Company to coordinate this intensive renovation project. Adding unique interior and exterior design elements, including a sawdust-filled feature wall, the space now houses a full kitchen, large conference spaces, offices, a children’s playroom, and a receiving lobby. Design/Build by G.L. Wilson Building Company. “Our project began with a building that originated in 1985 and had not seen any updates in 37 years. Designers and engineers were first on site to analyze the ‘situation at hand’- after many brainstorming sessions and analyzing what we wanted vs. what was reality, we confirmed a plan of action. This was a HUGE project for us, and G.L. Wilson understood that and accommodated many meetings and visionary discussions. Once ‘the ground broke’ on our project, the project manager and the site manager kept us updated each step of the way. They welcomed our many visits and ensured that our process was smooth. As with any remodel, hiccups were experienced but were swiftly ironed out to keep the project flowing. Relationships are key with any construction project; we fully trusted the entire G.L. Wilson team. Our company’s motto is “On Target from Start to Finish” – perhaps G.L. Wilson should adopt that motto because it was our experience with them. Our building (inside and out) is gorgeous. Job well done.” Erica Goodnight / Union Grove Lumber / CEO & President

  • Wilcombs II Industrial Facility

    Mooresville, NC Wilcombs II Industrial Facility Mooresville, NC Wilcombs II, G.L. Wilson Building Company’s newest project in Mooresville Business Park, is a 111,488 SF tilt-up industrial manufacturing facility. Design/Build by G.L. Wilson Building Company

  • Alpine Shredding Trucks - Commerce Boulevard Warehouse

    Statesville, NC Alpine Shredding Trucks - Commerce Boulevard Warehouse Statesville, NC Located in the Crawford Business Park district in Statesville, NC, this 12,000 SF pre-engineered metal building is now home to Alpine Shredding. Design/Build by G.L. Wilson Building Company

  • Statesville Retail Development

    Statesville, NC Statesville Retail Development Statesville, NC This project involved the site development and construction of a 67,670 square foot retail center. The center includes four anchor tenants: Staples (15,764 square feet), T.J. Maxx (23,600 square feet), Michaels (14,293 square feet), and PetSmart (14,013 square feet). The tenant exteriors and upfits for Staples, T.J. Maxx, and Michaels were designed by COR3 Design, LLC, while the upfit for PetSmart was designed by Interplan, PLLC. "We awarded a shopping center project with an aggressive schedule to G.L. Wilson. They made efforts at every level of their organization to work through challenges and deliver the project on time. The commitment from their company was critical to the project's success. Additionally, the job site was managed and supervised in a professional manner with an obvious emphasis on safety and quality." Shawn McCleskey, P.E. / RealtyLink, LLC / Director of Construction

  • Oakwood Middle School

    Statesville, NC Oakwood Middle School Statesville, NC This extensive middle school renovation, designed by FWA Group, spanned 71,176 square feet of existing structures. The scope of work included complete renovation of the gymnasium, installation of new science labs and prep rooms, renovation of restrooms, installation of new mechanical units and lighting, upgradation of locker rooms, incorporation of a new concession area, and installation of ADA handicap lifts. Additionally, extensive site work was carried out, including constructing new parking lots and driveways.

  • Benfield Sanitation Services

    Statesville, NC Benfield Sanitation Services Statesville, NC The Benfield Sanitation Services project included designing and constructing a new office and vehicle service area. The pre-engineered metal structure contains five vehicle bays with additional space for storage. The offices are attached to the rear structure and house several administrative offices, a kitchen, bathrooms, and a significant employee common area. Design/Build by G.L. Wilson Building Company.

  • Randy Marion Dealerships

    Various Locations Randy Marion Dealerships Various Locations Randy Marion Ford/Lincoln Dealership, located in Statesville, NC, features numerous sales and service department offices on the first floor, a spacious showroom with a two-story glass storefront, and an extensive vehicle service area. Completing the project in stages allowed for the opening of Randy Marion Ford before the Lincoln Dealership was finished. Located approximately fifty feet from Ford, the Lincoln site had safety barriers erected to separate dealership operations from construction activities with minimal interruptions. With the many high-quality materials used throughout, Randy Marion Lincoln embodies the luxury associated with the brand. This project also involved significant site work, paving, and ample parking areas to house the vehicle inventory. Design/Build by G.L. Wilson Building Company.

  • Paragon Films

    Taylorsville, NC Paragon Films Taylorsville, NC G.L. Wilson originally constructed Paragon Films’ building in the mid-1990s as a speculative building. In 2005, 2009, 2020, 2022, and 2024, G.L. Wilson worked with them to design and build over 143,000 SF of manufacturing additions to meet their growing needs. These additions were completed during normal operations, and the G.L. Wilson team worked to create flexible solutions to keep business moving along without interruptions. Design/Build by G.L. Wilson Building Company. “G.L. Wilson played a huge part in coming up with solutions to our problems and needs during this project, and it was a true pleasure doing business with them. Paragon Films has built a very good working relationship with G.L. Wilson, and we will continue to do business with them in the future.” Scott King / Paragon Films / Plant Manager (Former)

  • Iredell Memorial Hospital: Renovations

    Statesville, NC Iredell Memorial Hospital: Renovations Statesville, NC Construction on Iredell Memorial Hospital began in 1953, marking the start of the first major non-residential project in G.L. Wilson's history. Over the last 70 years, there have been numerous partnerships to meet the needs of the shared Statesville and wider Iredell County community, including several recent renovations at the hospital. The newest IMH project involves multiple patient wing renovations, which include all new interior finishes, upgraded utilities, and nursing stations.

  • Pine Lake Prep: Athletic Complex

    Mooresville, NC Pine Lake Prep: Athletic Complex Mooresville, NC Pine Lake Prep Charter School’s Athletic Complex boasts a sprawling 30-acre expanse designed to cater to the needs of passionate athletes and sports enthusiasts. The state-of-the-art complex features an impressive artificial turf football/soccer stadium field, irrigated natural grass softball and baseball fields, as well as modern amenities including a restroom and concessions building. Ample parking space is also available to accommodate the influx of spectators and visitors. This project was designed by G.L. Wilson Building Company’s in-house design team. Design/Build by G.L. Wilson Building Company. "The field has turned out wonderfully. Our kids and parents are very excited, and I am very appreciative of your efforts. As usual, John [Garland, Jr., Superintendent] has been terrific to work with, and your subcontractors were class acts. Thanks for all you do!" Chris Terrill / Pine Lake Prep Charter School / Head of Schools (Former)

  • Magnera

    Statesville & Mooresville, NC Magnera Statesville & Mooresville, NC These industrial production and distribution facilities required precision-built concrete pits and foundations for specialized equipment. The duration of the construction took place alongside an active manufacturing operation without causing disruption or delays. G.L. Wilson has worked in the Statesville location since its original opening as Providencia USA and has continued working with new ownership after transitioning to Magnera (formerly known as Berry Global). Design/Build by G.L. Wilson Building Company. "G.L. Wilson gets the highest reference from me and Providencia." Gene Konczal / Providencia USA / President & General Manager

bottom of page